Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 39 results ...

Abdelgawad, M A M (2011) Hybrid decision support system for risk criticality assessment and risk analysis, Unpublished PhD Thesis, , University of Alberta (Canada).

Al-Bataineh, M T (2008) Scenario-based planning for tunnelling construction, Unpublished PhD Thesis, , University of Alberta (Canada).

Allouche, E N (2001) A decision-support model for selection of a trenchless construction method, Unpublished PhD Thesis, , University of Alberta (Canada).

Alvanchi, A (2011) Incorporating the effects of complex dynamic interactions in the construction decision making process, Unpublished PhD Thesis, , University of Alberta (Canada).

Azimi, R (2011) An integrated real-time control system for structural steel fabrication projects, Unpublished PhD Thesis, , University of Alberta (Canada).

  • Type: Thesis
  • Keywords: control system; decision support; effectiveness; construction project; construction site; fabrication; monitoring; off-site construction; productivity; project control; safety; project manager; project performance; simulation
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/1151418723
  • Abstract:
    Off-site structural steel fabrication has become increasingly popular in industrial construction projects over the past decade due to advantages of higher productivity, better quality, better safety and improved time and cost effectiveness. The fast paced nature of off-site structural steel fabrication environments, constraints induced by the construction site, and the existing limitations within the shop, make the control process of off-site construction quite challenging. Successful delivery of off-site structural steel fabrication projects requires a reliable monitoring and control system. A key factor for the success and effectiveness of such a system is its ability to perform real-time monitoring and to evaluate and analyze project performance fast enough so that in the case of deviation the appropriate corrective actions can be taken in a timely manner. New achievements in automated data capturing systems and computer simulation techniques provide a reliable platform for effective project monitoring and control, as they can respectively reduce the time required to obtain as-built data and simulate different scenarios for possible corrective actions ahead of time. The functionality of control systems can be greatly increased by integrating these two techniques; however, such a feasibility has not been examined in great detail. The primary objective of this research is to address this issue by proposing a framework for new generation of project monitoring and control systems focusing on integrating automated data acquisition systems and computer simulation techniques that could be a robust decision support tool for project managers. The second objective of this research is enhancing control process in the dynamic environments of off-site construction shops based on the control theory concept. The proposed method makes project managers capable of prompt non-linear data analysis and of predicting the behavior of the performance of the off-site construction fabrication shops. This leads to promptly determining the best corrective action in the case of variance to achieve the desired performance of the shop with minimum cost. To illustrate the feasibility and practicality of the proposed framework and enhanced project control method, they were successfully implemented in an actual off-site structural steel fabrication shop.

Chehayeb, N N (1996) Simulation-based project control, Unpublished PhD Thesis, , University of Alberta (Canada).

Corona Suarez, G A (2007) Simulation-aided framework for assessing the effect of project quality management on construction performance, Unpublished PhD Thesis, , University of Alberta (Canada).

Dissanayake, G M (2006) An integrated computational intelligence framework for construction performance diagnosis, Unpublished PhD Thesis, , University of Alberta (Canada).

El Ghandour, W (2007) Integrated information-based construction simulation system, Unpublished PhD Thesis, , University of Alberta (Canada).

Elbarkouky, M M G (2010) A fuzzy consensus building framework for early alignment of construction project teams on the extent of their roles and responsibilities, Unpublished PhD Thesis, , University of Alberta (Canada).

ElNimr, A A (2011) Enhancing space modeling and mobile resources planning in construction operations through a simulation driven visualization framework, Unpublished PhD Thesis, , University of Alberta (Canada).

Fan, H (2007) Leveraging operational data for intelligent decision support in construction equipment management, Unpublished PhD Thesis, , University of Alberta (Canada).

Hajjar, D (1999) A unified modeling methodology for simulation-based planning of construction projects, Unpublished PhD Thesis, , University of Alberta (Canada).

Hasan, M S (2013) Decision support system for crane selection and location optimization on construction sites, Unpublished PhD Thesis, , University of Alberta (Canada).

Inyang, N I (2013) A framework for ergonomic assessment of residential construction tasks, Unpublished PhD Thesis, , University of Alberta (Canada).

Langevine, R (2006) A decision support system for the maintenance management of buildings, Unpublished PhD Thesis, , University of Alberta (Canada).

Lu, M (2000) Productivity studies using advanced ANN models, Unpublished PhD Thesis, , University of Alberta (Canada).

Mah, D E (2011) Framework for rating the sustainability of the residential construction practice, Unpublished PhD Thesis, , University of Alberta (Canada).

Manavazhi, M R (1998) A configuration-based modeling methodology for the automated generation of simulation models in construction, Unpublished PhD Thesis, , University of Alberta (Canada).

Mao, X (2008) The framework of TRIZ-enhanced-value engineering analysis and its knowledge management, Unpublished PhD Thesis, , University of Alberta (Canada).

Moghadam, M (2014) Lean-mod: An approach to modular construction manufacturing production efficiency improvement, Unpublished PhD Thesis, , University of Alberta (Canada).

Moghani, E (2013) A simulation-based framework for as-built documentation of construction process and product information, Unpublished PhD Thesis, , University of Alberta (Canada).

Mogollon, J D M (2009) Automation of design and drafting for wood frame structures and construction waste minimization, Unpublished PhD Thesis, , University of Alberta (Canada).

Nassar, N K (2005) An integrated framework for evaluation, forecasting and optimization of performance of construction projects, Unpublished PhD Thesis, , University of Alberta (Canada).

Olearczyk, J (2010) Crane lifting operation planning and lifted object spatial trajectory analysis, Unpublished PhD Thesis, , University of Alberta (Canada).

Saba, F (2012) A semantic-driven framework for facilitating reusability and interoperability of construction simulation modeling, Unpublished PhD Thesis, , University of Alberta (Canada).

Salem, O M (1999) Infrastructure construction and rehabilitation: Risk-based life cycle cost analysis, Unpublished PhD Thesis, , University of Alberta (Canada).

Shaheen, A A-H I (2005) A framework for integrating fuzzy set theory and discrete event simulation in construction engineering, Unpublished PhD Thesis, , University of Alberta (Canada).

Shahin, A A (2007) A framework for cold weather construction simulation, Unpublished PhD Thesis, , University of Alberta (Canada).

Sharma, V (2010) Asset levels of service-based decision support system for municipal infrastructure investment, Unpublished PhD Thesis, , University of Alberta (Canada).

Song, L (2004) Productivity modeling for steel fabrication projects, Unpublished PhD Thesis, , University of Alberta (Canada).

Taghaddos, H (2010) Developing a generic resource allocation framework for construction simulation, Unpublished PhD Thesis, , University of Alberta (Canada).

Van Tol, A A (2005) Agent embedded simulation modeling framework for construction engineering and management applications, Unpublished PhD Thesis, , University of Alberta (Canada).

Wang, P (2006) Production-based large scale construction simulation modeling, Unpublished PhD Thesis, , University of Alberta (Canada).

Xie, H (2011) Improving dynamic project control in tunnel construction, Unpublished PhD Thesis, , University of Alberta (Canada).

Xu, J (2001) CAD-based integrated simulation environment (CAD-ise), Unpublished PhD Thesis, , University of Alberta (Canada).

Younes, B (2013) A framework for invoice management in construction, Unpublished PhD Thesis, , University of Alberta (Canada).

Yu, H (2010) An integrated approach toward lean for production homebuilders, Unpublished PhD Thesis, , University of Alberta (Canada).

Zhang, X (2006) Toward innovative and efficient infrastructure delivery, Unpublished PhD Thesis, , University of Alberta (Canada).